We have full procedures in place in accordance with codes PD5500, ASME IX and PED 97/23/EC which cover all our manufacturing disci-plines.
This includes Design, Contract Control, Manufacturing, Welding and Non-Destructive Testing.
All pressure vessel contracts have design appraisal and manufacturing verification using independent authorities such as Lloyds Register and Zurich.
All pressure parts are typically subjected to an on site Hydrostatic Test usually in the presence of a third party inspector.
Packaged generator sets are fully tested with or without the presence of the customer, for 48 hours before being released for delivery.